Online Store: Craftsmanship Operating Procedures (COP's)
Main Storefront

Craftsmanship Operating Procedures - Residential Exterior Series (English)

Item Options
Sign in for your pricing!
Price: $300.00
Quantity: *
Choose an option:
* Zip File - This items includes 20 Residential Exterior COP's.

Craftsmanship Operating Procedures
Residential Exterior Series

A. COP Training Program Guide                                                  To View Sample COP
B. COP Training Program Checklist
C. Session Attendance Record
D. Employee Training Record
E. Standard Tools

E-GL-1 Task Sequencing for Preparation
E-GL-2 Job Site Shop Setup
E-GL-3 Protection
E-GL-4 Job Completion

E-PR-1 Washing
E-PR-2 Failed Coating Removal - Scraping & Sanding
E-PR-3 Filling Nail Holes
E-PR-4 Failed Coating Removal - Clapboard Specific by Scraping & Sanding
E-PR-5 Failed Coating Removal - Shingle & Shake Siding by Scraping & Sanding
E-PR-6 Stucco Preparation & Repair
E-PR-7 Caulking
E-PR-8 Panel Door Preparation for Painting
E-PR-9 Window Preparation, Double-Hung with Divided Lites
E-PR-10 Failed Coating Removal – Trim by Scraping & Sanding
E-PR-11 Wood Shutter Prep
E-PR-12 New Woodwork Prep
E-PR-13 Rot Repair
E-PR-14 Deck Restoration

E-PT-1 Clapboard Coating
E-PT-2 Shingle & Shake Coating
E-PT-3 Stucco Coating
E-PT-4 Panel Door Coating
E-PT-5 Window Coating, Double-Hung with Divided Lites
E-PT-6 Trim Coating
E-PT-7 Wood Louvered Shutter Paint